Skip to main content
Return to Directory

Park Drive Pedestrian Safety

Categories
Description

(Updated as of September 2021) 

The following is an anticipated future year project, not anticipated to begin until after 2027. Anticipated costs are rough estimates and will be refined further should the project timeline accelerate.

Park Drive Pedestrian Safety

Complete a design study to address additional pedestrian crossing issues along NE Park Drive between 17th Ave NE and the trail crossing east of Central Park Lane NE, including a potential second traffic signal at the Grand Ridge Elementary School driveway.